• The prestressed concrete beam bridge with corrugated web has greatly improved the traditional prestressed concrete beam bridge.

    波纹钢腹板预应力混凝土梁桥是对传统预应力混凝土梁桥的一次重大改进

    youdao

  • The main difficulty in analysis of unbonded prestressed concrete beam bridge is the coupling between the sectional strength of member and the whole structural deformation of member.

    分析粘结预应力混凝土梁桥主要困难在于构件截面强度构件整体变形耦合

    youdao

  • The long-span prestressed concrete beam bridge is likely to craze in operation, which decreases the bridge's safety and durability and then leads to its structure's early failure and destruction.

    运营中的跨径预应力混凝土梁桥箱梁普遍开裂,严重影响桥梁结构安全性耐久性造成了桥梁过早失效和破坏。

    youdao

  • The traditional steel beam reaction system was substituted by prestressed concrete reaction system in the ultrahigh static loading tests of bored piles of Fuxing Bridge.

    复兴大桥超高吨位灌注桩试验预应力混凝土力装置替代传统钢梁反力系统

    youdao

  • Compared with prestressed rebar concrete beam, its stiffness is more little. Especially in the-big-span bridge, its deflection is a important control factor which influence its application.

    预应力钢筋混凝土相比刚度较小,特别是跨径桥梁中,其挠度变形影响其应用的重要控制因素

    youdao

  • Xiamen Yinhu bridge is a partially cable-stayed prestressed concrete bridge, whose pier, tower and beam are consolidated together.

    厦门同安银湖大桥国内第一座使用环氧全涂平行钢绞线斜拉索的预应力混凝土部分斜拉桥,固结体系。

    youdao

  • By a actual engineering example in Leikou bridge, the design of prestressed concrete T-frame bridge hanging a beam.

    通过磊口大桥工程实例预应力混凝土T型刚构桥设计进行总结。

    youdao

  • With its excellent section characters, the prestressed concrete box beam plays a main role in the girder bridge.

    预应力混凝土箱梁优良的截面性质梁桥中占据主要地位

    youdao

  • Then the gray system theory is applied in the construction control of long-span prestressed concrete continuous beam bridge.

    从而灰色系统理论成功应用到大跨度预应力连续梁桥施工控制

    youdao

  • And during the cantilever construction of the prestressed concrete continuous rigid frame bridge, the beam axis shape of formed blocks can't be regulated during the subsequent constructions.

    而且,预应力混凝土连续刚构桥悬臂施工过程中,已建成线形后期施工是不可调整的。

    youdao

  • In this paper, some design principles and construction methods of a new type composite continuous beam bridge with partially prestressed concrete have been put forward.

    本文提出一种桥型——部分预应力混凝土组合连续梁桥设计原理施工方法

    youdao

  • The main bridge of Sanmenjiang Bridge in Liuzhou is a 3-span partial cable-stayed prestressed concrete box beam bridge with two pylons and double cable planes.

    柳州三门江大桥主桥双塔、双索面、三跨部分斜拉预应力混凝土箱梁

    youdao

  • Base on the above theoretical analysis, the article carries on the time-dependent system reliability analysis to some prestressed concrete continuous beam bridge.

    基于以上理论分析本文预应力混凝土连续梁桥进行时变系统可靠度分析。

    youdao

  • However, too much creep generally appeared in prestressed concrete simply supported beam bridge in use.

    现役桥梁中,却普遍出现了梁体徐上拱过大的问题。

    youdao

  • However, too much creep generally appeared in prestressed concrete simply supported beam bridge in use.

    现役桥梁中,却普遍出现了梁体徐上拱过大的问题。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定