To ensure the quality and security of the prestressed concrete continuous rigid frame bridge, construction control was of great importance.
为了保证大跨径连续刚构桥悬臂施工的质量和安全,施工控制是非常重要的。
The influence of concrete creep on bridge structure under the construction and operation stage for prestressed concrete continuous rigid frame bridge and cable-stayed bridge is also analyzed.
本文还针对预应力混凝土连续刚构桥和斜拉桥,分析计算了其在施工和运营阶段,混凝士徐变对桥梁结构的影响。
It is one of the defects that cracks occur in the bottom slab of an extra-long prestressed concrete continuous rigid frame bridge. There are many influence factors.
大跨度预应力混凝土连续刚构桥底板出现开裂是该类桥梁出现的问题之一,其影响因素较多。
By test, we will know more about prestressed concrete semi-rigid frame continuous box girder bridge.
通过试验,使我们对于预应力混凝土半刚构-连续梁桥有了进一步的认识。
The prestressed concrete continuous rigid frame bridge often adopts the economical and reasonable segmental construction technique with cantilever installation.
预应力混凝土连续刚构桥常常采用经济合理、方便快捷的悬臂现浇施工法。
The thesis studies and analyzes parameter design of long span prestressed concrete continuous rigid-frame bridge.
本文对大跨径预应力连续刚构桥的设计参数进行了分析研究。
And during the cantilever construction of the prestressed concrete continuous rigid frame bridge, the beam axis shape of formed blocks can't be regulated during the subsequent constructions.
而且,在预应力混凝土连续刚构桥悬臂施工过程中,已建成梁段的线形在后期施工中是不可调整的。
And during the cantilever construction of the prestressed concrete continuous rigid frame bridge, the beam axis shape of formed blocks can't be regulated during the subsequent constructions.
而且,在预应力混凝土连续刚构桥悬臂施工过程中,已建成梁段的线形在后期施工中是不可调整的。
应用推荐