For the construction process of twice prestressed continuous beam, the stress analysis and deformation analysis method during construction stage is provided in this paper.
根据二次预应力连续梁的施工过程,提出了施工阶段的应力和变形分析方法。
The controlled crucial works for this contract section is the construction for the prestressed concrete continuous combined box beam.
本合同段控制性关键工程是预应力砼连续组合箱梁的施工。
In this paper the moment redistribution due to prestressing in precast segment continuous prestressed concrete beam erected by cantilever method is described.
本文叙述了悬臂拼装预应力混凝土连续梁的预加力引起的弯矩重分布。
Most of the research on moment redistribution is based on continuous beam structures, a little on prestressed concrete frames.
关于预应力结构的内力重分布研究很多是关于连续梁结构的,对预应力框架的研究相对较少。
The paper discussed proportion between side span and middle span in three spans prestressed continuous box beam bridge.
本文对三跨预应力连续箱梁桥的边跨与中跨比例问题进行了初步的探讨。
Then the gray system theory is applied in the construction control of long-span prestressed concrete continuous beam bridge.
从而将灰色系统理论成功应用到大跨度预应力砼连续梁桥的施工控制中。
And during the cantilever construction of the prestressed concrete continuous rigid frame bridge, the beam axis shape of formed blocks can't be regulated during the subsequent constructions.
而且,在预应力混凝土连续刚构桥悬臂施工过程中,已建成梁段的线形在后期施工中是不可调整的。
Based on ANSYS programs, the nonlinear finite element models of two-span prestressed steel-concrete continuous composite beam were established.
本文基于大型有限元软件ANSYS,建立预应力钢-混凝土两跨连续组合梁的非线性有限元分析模型。
The moment modulation of prestressed concrete frame has some differences compared with that of continuous beam.
关于预应力结构的内力重分布研究很多是关于连续梁结构的,对预应力框架的研究相对较少。
In this paper, some design principles and construction methods of a new type composite continuous beam bridge with partially prestressed concrete have been put forward.
本文提出了一种新桥型——部分预应力混凝土组合连续梁桥的设计原理与施工方法。
Research on law of stress increment of unbonded tendons in continuous prestressed concrete beam and slab;
比较了有粘结与无粘结力筋两种预应力混凝土结构的优缺点。
Base on the above theoretical analysis, the article carries on the time-dependent system reliability analysis to some prestressed concrete continuous beam bridge.
基于以上的理论分析,本文对某预应力混凝土连续梁桥进行时变系统可靠度分析。
Base on the above theoretical analysis, the article carries on the time-dependent system reliability analysis to some prestressed concrete continuous beam bridge.
基于以上的理论分析,本文对某预应力混凝土连续梁桥进行时变系统可靠度分析。