If the information being disclosed to management is cost only, then it would appear the project is running under budget.
如果报告给管理的信息只是成本,那么将出现的情况是项目正在按照预算进行。
A business-sponsored project will have a budget based on a business case that balances cost against the benefit of a solution.
一个由业务赞助的项目将拥有一个基于业务案例的预算,该预算平衡解决方案的收益和成本。
Controlling and updating the scope, cost, budget, schedule and quality requirements based upon approved changes, by coordinating changes across the entire project.
根据批准的变更控制与更新范围、费用、预算进度和质量要求,协调整个项目的变更。
Work Management - plan, cost, budget, resources and scheduling of project and non-project work.
工作管理(Work Management)——计划、成本、预算、资源、项目时间安排以及非项目的工作。
Establishes the construction drawing budget, definite project construction cost basis.
是编制施工图预算,确定工程造价的依据。
Cost control-controlling changes to the project budget.
费用控制-控制项目预算变更。
Manage the project budget based on the cost estimation budget.
在费用评估预算的基础上管理项目预算。
Converting a final cost estimate into a project budget compatible with an organization's cost accounts is not always a straightforward task.
把最终的成本估算转化成与组织的成本报告兼容的项目预算并不是一项简单的工作。
Project related cost verification and budget controlling.
项目相关成本的预算控制及确认。
As new project team leader, you need to lead and complete new projects into final production run on time, on cost budget and meeting quality requirements.
作为客户新项目的主要牵头人,需要准时、在预算范围内、高品质地完成客户的新项目的投产运行。
Project cost Management includes the processes involved in planning, estimating, budgeting, and controlling costs so that the project can be completed within the approved budget.
项目成本管理包括与成本计划、成本估算、成本预算、成本控制相关的过程,用以确保项目能在核准预算内完成。
In the software project management's cost management mainly displays in aspects and so on project estimate, budget and control.
软件项目管理中的成本管理主要表现在项目的估算、预算和控制等方面。
And carries on the cost estimate, the budget and the control to the morning star company's ERP project.
并对晨星公司的ERP项目进行成本估算、预算及控制。
Importance of optimization design and cost control during the design stage of a project is put forward. Project budget rating and pricing basis are also analyzed.
阐述工程设计阶段进行优化设计和造价控制的重要性,并对工程建设概预算定额及计价依据进行分析。
Strict implementation of the company"s financial system, strengthening the project budget, cost management approval."
严格执行公司财务制度,加强项目预算、成本管理。
It also discusses how to determine the project cost through analysis and calculation by (utilizing) the existing Budget Quota issued by the Construction Department.
并利用现有的部颁预算定额,通过分析计算,确定钢桥面铺装的工程造价。
Plan project budget and control project cost;
编制项目预算,控制项目运行成本;
Project cost can be effectively controlled from the aspects of implementation, bidding, contract management, material and stuff price, construction supervision and project budget.
建设实施阶段,建设单位在招投标、合同管理、材料价格、施工管理(监理)、工程决算等几个方面,加强管理能够有效地控制工程造价。
The plan document sure every project investment and, in fact, is the project plan price, namely the cost budget estimates or budget cost.
这个计划文件所确定的每项工程投资额,实际上也就是该工程的计划价格,即概算造价或预算造价。
Responsible for the general cost control aspects of each project, the preparation and submission of budget estimates to management and their successful implementation.
负责维养工作的的总体费用管理方面的工作,编制部门的费用预算,并负责预算的执行和向管理层提交。
The budget of installation project is an important basis for bidding process, it's also an vital reference to determine installation cost.
安装工程的预结算是招投标的重要基础,也是合理确定安装工程造价的重要依据。
More than 5 years' experience in on-site drainage and electricity engineer, familiar with the project budget and settlement, possesses the qualification of above cost engineer ;
从事施工现场水电工程师岗位5年以上,熟悉本专业工程预结算工作,持有造价员以上执行资格;
Abstract: : the cost of the project to project budget, is through certain planning process, calculation and determine the price of a building or structure planning document.
摘要:对工程造价进行概预算,是通过一定的计划程序、计算和确定建筑物或构筑物价格的计划文件。
Abstract: : the cost of the project to project budget, is through certain planning process, calculation and determine the price of a building or structure planning document.
摘要:对工程造价进行概预算,是通过一定的计划程序、计算和确定建筑物或构筑物价格的计划文件。
应用推荐