Cost calculation for each project, compare the actual cost with project target cost.
核算项目成本,并比较实际成本与项目目标成本的差异。
So, it can realize the achieve dynamic management of engineering projects cost and assure that enterprise realize target value of engineering project cost.
该模型实现了对工程项目成本的动态管理,使企业能够实现工程项目成本计划目标值。
The essence of cost planning is to enable the architect to control the cost of a project (within the target) while he is still designing.
成本计划的实质就是使建筑师在设计时将工程成本控制在目标范围以内。
The quality of the cost target management has direct relations to the success or failure of the engineering project management.
成本目标管理的质量直接关系到工程项目管理的成败。
To complete the project with a pre-concerted plan of cost, schedule and quality is the target of Project Management.
项目管理的目的是为了使项目能够按照预定的成本、进度、质量顺利完成。
The fixed percentage or fixed fee is determined at the outset of the project, while variable fee and target estimates are used as an incentive to reduce costs by sharing any cost savings.
通过分摊任何可节约成本,特别是当变量和目标使用费用估计用作奖励来降低成本时,我们需要在这个项目开始时确定固定百分数或固定费用。
In project evaluation, target profit is divided into normal profit and economic profit. Impact of profit elasticity of the cost, additional cost and increment cost on economic profit is analyzed.
在工程项目中,目标利润分为正常利润和经济利润,分析工程成本利润弹性、追加价格利润弹性、创优增量成本利润弹性对经济利润的影响。
In project evaluation, target profit is divided into normal profit and economic profit. Impact of profit elasticity of the cost, additional cost and increment cost on economic profit is analyzed.
在工程项目中,目标利润分为正常利润和经济利润,分析工程成本利润弹性、追加价格利润弹性、创优增量成本利润弹性对经济利润的影响。