It is crucial for successful project management and schedule control to have a scientific and efficient project execution plan.
制定一套科学、高效的项目实施计划并按计划进行进度控制是成功实施项目管理,使工程按期投产的主要因素。
Prepare project management for some project, control project schedule, control project cost and down project risk.
参与部分项目的项目管理工作,把控项目进度,控制项目成本,降低项目风险;
The quality control, cost control, schedule control, and safety control are the "four control"in the project construction management.
质量控制、成本控制、进度控制、安全控制是项目施工管理中的“四大控制”。
Plan and schedule control, cost control, quality control and safety control are important parts of project management.
计划与进度控制、成本控制、质量控制和安全控制是工程项目管理的重要组成部分。
Project development plan, and the project execution schedule control and management.
制定项目开发计划,并对项目执行进度进行控制、管理。
Here, different developing hierarchies and its corresponding key technology are discussed emphatically: visual-project management, task schedule, workflow control and conflict settlement etc.
重点讨论了协同工作支持环境相应的关键技术:项目管理、任务规划、工作流控制、冲突解决等技术。
However, owing to the outdated project management system and nonstandard architectural market, there exist some problems such as schedule control, operation management and bidding, etc.
但由于当时水利工程管理体制的落后及建筑市场的不规范,在进度控制、运行管理、招投标等方面存在一些问题。
The paper puts forward some ideas on project management and design schedule control in modern office environment.
文中就现代办公环境下的项目管理和设计进度控制工作提出一些想法,供商榷。
The intention of the project management is to schedule, organize and control all activities to achieve the project goal eventually. No matter how difficult it is and what kind risks are there.
项目管理的目的是计划、组织并控制所有的活动以达到困难重重和极具风险的情况下仍能成功而顺利地完成一个项目目标。
Project earned value management is the most effective co-ordinate control methods of cost and schedule by far, but our research on the earned value management is still very limited.
项目挣值管理是迄今为止最有成效的一种进度与费用协调控制方法,然而我国对挣值管理的研究还很有限。
The major control elements for a project management should be its quality, schedule and costs.
项目管理的主要控制要素是质量、进度和成本。
Particularly, this thesis has given in-depth discussion about implementation procedure of project management and schedule (or quality or cost) control with matrix management.
论文特别对项目管理实施程序及矩阵式管理过程中如何实施进度、质量、费用等控制进行了较深入的探讨。
The WAPI project schedule control is based on critical chain project management. The core is the management and controlling of buffer.
WAPI项目进度控制是基于关键链管理的进度控制,核心是对缓冲的管理和控制。
A complete construction project management should both include schedule and control. The former is the basis of the latter, and the latter is the security of the former.
完整的进度管理既应有进度计划,又有进度控制,前者是后者的基础,后者是前者的保障。
A complete construction project management should both include schedule and control. The former is the basis of the latter, and the latter is the security of the former.
完整的进度管理既应有进度计划,又有进度控制,前者是后者的基础,后者是前者的保障。