These problems could make the software project lose control on quality, plan and cost and make bad result at last.
这些问题将会使软件项目在质量、进度、成本等方面失去控制,最终导致失败。
Moreover sampling plan determined by the factors such as sampling risks was related to the process efficiencies including process quality control and inspection cost control.
而由抽样风险确定的抽样方案直接关系到加工过程质量控制和检验成本控制等加工效率问题。
Plan and schedule control, cost control, quality control and safety control are important parts of project management.
计划与进度控制、成本控制、质量控制和安全控制是工程项目管理的重要组成部分。
To control the engineering quality cost control, the following work should be carried out: quality cost projection, plan, accounting, analysis, assessment and report.
开展工程质量成本控制,应做好质量成本预测、计划、核算、分析、考核和报告等工作。
But some problems still exists during the implementation, like lacking of proper quality cost management plan, resulting in indistinct cost management and control results.
但在实施中仍然存在较多问题,集中表现为缺乏合理的质量成本管理方案,导致质量成本管理与控制成效不明显的结论。
The quality cost management is the series activities of organization of employees and departments concerned to predict, plan, account, analyse, control and examine the quality cost.
质量成本管理是企业动员与质量职能有关的部门和职工对质量成本进行的预测、计划、核算、分析、控制和考核等环节所进行的一系列的组织和活动。
The quality cost management is the series activities of organization of employees and departments concerned to predict, plan, account, analyse, control and examine the quality cost.
质量成本管理是企业动员与质量职能有关的部门和职工对质量成本进行的预测、计划、核算、分析、控制和考核等环节所进行的一系列的组织和活动。