• The method of shallow layer seismic image is used to test a reinforced concrete dam and the test results are comprehensively analyzed.

    钢筋混凝土大坝采用浅层地震映像检测实例结果进行了综合分析。

    youdao

  • A study on the dynamic response of a rockfill dam with reinforced concrete facing excited by earthquake by means of nonlinear finite element method was presented in this paper.

    本文采用动力非线性有限元研究钢筋混凝土面板堆石坝地震反应,并用滑移面上的静、动应力求得坡抗震稳定安全系数时程曲线。

    youdao

  • The causes for the serious leakage of the reinforced concrete face dam of Zhushuqiao Reservoir are analyzed based on the design, construction and field measured data.

    根据设计施工现场检测资料,分析了树桥水库钢筋混凝土面板堆石坝严重渗漏原因

    youdao

  • The Xiaoshan Hydropower Station consists of reinforced concrete face rockfill dam, bank spillway, diversion system and power house.

    小山水电站工程钢筋混凝土面板堆石坝、岸坡溢洪道、引水系统及发电厂房组成。

    youdao

  • The reinforced concrete face-slab is adopted as impervious body by Long Tan RCC Dam.

    龙滩碾压混凝土重力坝采用钢筋混凝土面板作为防渗

    youdao

  • The reinforced concrete face-slab is adopted as impervious body by Long Tan RCC Dam.

    龙滩碾压混凝土重力坝采用钢筋混凝土面板作为防渗