Repair and overhaul of components soaks up valuable time and resources, often resulting in costly production downtime, while the equipment or machinery is offline being repaired.
修理和大修的组成部分如饥似渴地吸收宝贵的时间和资源,往往导致昂贵的生产停工,而设备或机械离线得到修复。
Complete and manage assembly line repair form, and define related action plan to reduce assembly line downtime.
完善应急维修文件管理,并制定相应措施和计划来降低组装线停机时间。
The high cost of wind-turbine downtime due to repair not only affects the productivity of the turbine, but also results in unplanned costs which affect the cost of energy and project viability.
这些由于风机停机维修所产生的高额成本不仅会影响风机的生产率,还会导致额外的成本,对发电成本和项目本身会造成影响。
In order to reduce downtime caused by operating losses and repair costs, attention should be paid to walk on the lower part of body maintenance and inspection.
为了降低因停机而造成的作业损失及修理费用,应重视对下部行走体的保养和检查。
However, the lower part of body to walk the event of failure would be to spend a considerable amount of downtime and repair costs are not small.
但是,下部行走体一旦发生故障则会花费相当多的停机时间和不小的修理费用。
For a typical turbine, 20% of the downtime is due to gearbox failures, and an average gearbox failure takes about 256 hours to repair.
一个典型的风力发电机,20%的停车时间是由于变速箱的故障引起的,而平均每个变速箱的故障修理时间大概是256小时。
For a typical turbine, 20% of the downtime is due to gearbox failures, and an average gearbox failure takes about 256 hours to repair.
一个典型的风力发电机,20%的停车时间是由于变速箱的故障引起的,而平均每个变速箱的故障修理时间大概是256小时。