• Due to the dramatic increase of meter reading task after the reformation of rural power network, automatic meter reading is hence necessary.

    然而农村电网改造抄表工作量剧增,使引入自动化手段十分必要

    youdao

  • In the reconstruction of rural power network, there exist the problems of power consumption management, power consumption safety and line losses, etc.

    农村电网改造中,存在着偏远农户用电管理、用电安全线路损耗问题

    youdao

  • Combining with the actual situation of rural power network, it put forward the measures of reducing power network loss from two aspects of technology and management.

    面向实际应用目的,提出了一种考虑输电网络损耗及线路过负荷约束的火力发电机起停计划方法。

    youdao

  • The present situation of meter reader research is analyzed, and it is pointed out that the remote automatic meter reading system is not suitable for rural power network.

    分析了国内外表器研究现状指出目前研究远程自动抄表系统适合中国农村使用。

    youdao

  • In the reconstruction of rural power network, there exist the problems of power consumption management, power consumption safety and line losses, etc. of remote peasant households.

    农村电网改造中,存在偏远农户用电管理、用电安全线路损耗问题

    youdao

  • The research method and the proposed index may provide valuable reference for cost evaluation works of Chinese rural power network transmission and transformation construction projects.

    研究方法及其评价指标我国农网输变电工程造价水平评价工作提供了有价值参考

    youdao

  • Products are widely used in network communications, cable TV, data transmission, construction, urban and rural power grids and other ancillary items.

    产品广泛应用于网络通信有限电视数据传输建筑工程城乡电网改造以及其他配套项目。

    youdao

  • And the system analysis, system design and system implement of rural power distribution network management developed by component GIS were studied particularly.

    深入探讨利用组件式GIS开发农村配电网管理系统系统分析设计实施

    youdao

  • In light of the actualities of rural power distribution network, this paper describes the necessity and the best means of low voltage reactive power compensation for rural distribution network.

    针对农村配电网具体状况,说明对农村配电网进行低压补偿必要性及其重要意义,并提出了农村配电网无功补偿的最佳方法。

    youdao

  • The mathematical model of optimal reactive power planning on rural power distribution network has been established in this paper.

    本文建立农村配电网补偿优化规划模型

    youdao

  • The utility model which is connected into a power supplying network charged by accumulators is another clean energy source for urban and rural road traffic.

    装置联入蓄电池充电供电网络作为城乡道路交通又一洁净能源

    youdao

  • The utility model which is connected into a power supplying network charged by accumulators is another clean energy source for urban and rural road traffic.

    装置联入蓄电池充电供电网络作为城乡道路交通又一洁净能源

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定