Responsible for project cost and schedule control.
负责项目成本和进度控制。
Schedule control-controlling changes to the project schedule.
进度控制——控制项目进度的变更。
In the schedule control, the main tools are Gantt chart and check list.
在进度控制方面,使用的主要工具是甘特图和核查清单。
Project development plan, and the project execution schedule control and management.
制定项目开发计划,并对项目执行进度进行控制、管理。
On the basis of that, the aviation model development project management schedule control framework was proposed.
在此基础上,提出了航空型号研制项目管理的进度控制模型。
The paper puts forward some ideas on project management and design schedule control in modern office environment.
文中就现代办公环境下的项目管理和设计进度控制工作提出一些想法,供商榷。
So this paper analyzes the adverse effects of the patterns from quality control, schedule control and cost control.
从质量控制、进度控制和成本控制三方面分析了该模式的不利影响。
Methods for realizing project schedule control using the "earned value evaluation principle" were specially analyzed.
重点分析了运用“赢得值评估原理”实现工程项目进度控制的方法。
Plan and schedule control, cost control, quality control and safety control are important parts of project management.
计划与进度控制、成本控制、质量控制和安全控制是工程项目管理的重要组成部分。
It is crucial for successful project management and schedule control to have a scientific and efficient project execution plan.
制定一套科学、高效的项目实施计划并按计划进行进度控制是成功实施项目管理,使工程按期投产的主要因素。
Digital management mode of the application to determine validation correct (prevention) production schedule control measures need;
应用数字化管理模式确定的验证纠正(预防)生产进度控制措施的需求;
The quality control, cost control, schedule control, and safety control are the "four control"in the project construction management.
质量控制、成本控制、进度控制、安全控制是项目施工管理中的“四大控制”。
The WAPI project schedule control is based on critical chain project management. The core is the management and controlling of buffer.
WAPI项目进度控制是基于关键链管理的进度控制,核心是对缓冲的管理和控制。
Meanwhile it also studied the feasible tools and methods used in project plan and schedule control, such as SWOT analysis, SWART principle, WBS etc.
同时,对项目的计划与进度控制过程中所使用的具体方法进行了研究,诸如swot分析、SWART原则、WBS分解等。
Based on the characteristics of Aviation products, this paper mainly focus on the research of schedule control technology in the process of project running.
本文针对航空产品特点,对项目运行过程进度控制技术进行研究。
This paper probes into the countermeasures for doing well the construction management from aspects of the schedule control, cost control, and quality control, etc.
从工程的进度控制、成本控制、质量控制方面探讨了搞好施工管理的对策。
Meanwhile it also studied the feasible tools and methods used in project plan and schedule control, such as SWOT analysis, SWART principle, WBS etc. in this paper.
同时,对项目的计划与进度控制过程中所使用的具体方法进行了研究,诸如swot分析、SWART原则、WBS分解等。
Site schedule control is an important link of whole project control, and platform fabrication is a critical activity of Pinghu oil and gas field development project.
报告。平湖油气田工程现场进度控制是整个项目控制过程中的一个重要环节,平台建造是整个平湖油气田项目的关键活动之一。
Finally, in the previous research foundation, this paper has put forward specific schedule control programs and measures in use of the schedule control methods and tools.
最后在前面研究结果的基础上,运用项目进度控制理论,提出进度控制的具体方案和保障措施。
Then it also discusses the general process of schedule control, which including three steps, action preparing, process monitoring and controlling, project results evaluation.
然后讨论了项目进度控制一般过程,包括准备行动程序、过程监测与控制以及最后项目评估三个阶段并对其进行分析。
By analyzing the difference of the actual schedule and plan, combined to the actual cases, found the schedule control methods which fit for the characteristics of this project.
通过分析专业实际进度与专业计划进度的差距,结合实际找到适合本项目特点的进度控制方法。
The installation quality of the air-cooling island, which is a turn-key project of Shenmu Yangguang Power Plant, is very important, and its schedule control is also very complicated.
陕西神木阳光电厂工程空冷岛的安装质量控制主要是保证焊缝的施工质量和风机找平对中的质量,进度控制就是确保施工节点不变。
In the performing cost control phase manager not only think lot of quality control and schedule control but also inviting public bidding control which is a process of choosing partner.
事中成本控制除了要重视质量控制和进度控制,还要重视招投标控制,因为这是选择合作伙伴的过程。
However, owing to the outdated project management system and nonstandard architectural market, there exist some problems such as schedule control, operation management and bidding, etc.
但由于当时水利工程管理体制的落后及建筑市场的不规范,在进度控制、运行管理、招投标等方面存在一些问题。
By using a real case of an offshore oil project as example, this paper presents the method and approach utilized in the process of framework planning and design stage for schedule control.
以某海洋石油工程项目的进度控制管理为例,阐述在设计阶段网络计划的编制、设计过程中进度控制的方法和手段。
Present international conventional "earned value evaluation principle" as well as how to combine the earned value with project schedule control and cost control organically were also expounded.
阐述当前国际通用的赢得值评估原理,以及如何将赢得值与项目进度控制和费用控制有机地联系起来。
As adults we also have the luxury of being able to control our own diaries and it's important that we schedule in time to enjoy the things we love.
作为成年人,我们也有能掌控自己工作日程的快乐,并且能适时安排去享受我们所爱的事情,这一点很重要。
We often feel that we have no control over our schedule but this is a myth.
我们经常感到我们无法控制我们的日程表,但这是一个错误的看法。
But as adults we also have the luxury of being able to control our own diaries and it's important that we schedule in time to enjoy the things we love.
但作为成年人,我们也获得了支配自己日记的能力,而且能够安排时间来享受我们喜欢的事情,这一点很重要。
They proactively take control of their schedule so that they are at their best, rather than allowing their schedules to control them and their family life.
他们主动掌握自己的进度控制,使他们处于最佳,而不是让他们的日程安排,以控制他们和他们的家庭生活。