In the first couple of iterations of Construction, we can ease the users into more strict change control by allowing them to introduce new scope until they have exhausted their contingency points.
在构建的前面几个迭代中,我们能够通过允许用户引入新的范围,直到他们耗尽了他们的偶然点,从而使用户不必受到过多的变更控制的束缚。
The air gap control with the mass change of magnetic suspension nonlinear system and the large scope variety of air gap is considered.
考虑磁悬浮非线性系统在质量变化和空气间隙大范围变化情况下的空气间隙控制问题。
Keeping this scope under control requires a formal procedure for approving any change to the original scope of the project;
但是,控制住这个初始范围需要有正式的审批流程——任何对原项目范围的变更都需要审批;
Keeping this scope under control requires a formal procedure for approving any change to the original scope of the project;
但是,控制住这个初始范围需要有正式的审批流程——任何对原项目范围的变更都需要审批;
应用推荐