This paper introduces the boundary element method to study the affect of the blanket length for earth-rock dam on the infinite deep pervious foundation on the seepage of dam foundation.
采用边界元法研究无限深透水地基上土石坝铺盖长度对坝基渗流的影响。
Combined with simulation test results of dam foundation seepage of Longtouqiao Reservoir, the dam foundation seepage was analysed and the seepage control measures were proposed.
结合龙头桥水库坝基渗流模拟试验成果,对龙头桥水库土坝基础渗流进行了综合分析,并提出了防渗措施。
The boundary point method has been applied to solve the problem of dam foundation seepage, and its results are compared with the results from finite element method and fissure network method.
采用边界点法分析坝基渗流问题,编制了计算程序并与有限单元法和裂隙网络法的计算结果比较。
Studying seepage state in dam foundation through the variation of temperature field in the foundation before and after dam construct I on is a new means for seepage monitoring.
通过建坝前后地温场的变化了解坝基渗流状态是渗流监测中的新手段。
Characteristic water level and reservoir capacity is fixed, freeboard and dam crest is calculated, seepage prevention of dam body, dam foundation and dam sheeting is discussed.
针对除险加固措施,确定了水库特征水位与库容,计算了坝顶超高及坝顶高程,探讨了坝体和坝基防渗、坝面护坡及防冻等问题。
The reliability of seepage prevention system is a key problem for high rockfill dam built on the foundation of large overburden depth.
在深覆盖层地基上修建高土石坝,其防渗体系的可靠性是一项关键技术问题。
It can be proved that the non linear seepage law can not be approximately regarded as the linear seepage law in analysis of non Darcy seepage through dam foundation.
可以看出,在坝基非达西渗流分析中,不能采用线性渗流规律来近似代替非线性渗流规律。
The effect of increasing drainage depth on seepage discharge and uplift of dam foundation is studied when curtain depth is fixed.
帷幕深度一定时,分析了排水孔深度的变化对渗流量和扬压力的影响。
A combined measure of paving compound film on the upstream surface of dam and setting up vertical anti-seepage in dam foundation is adopted to treat leakage.
因此一般采用上游坝面铺设复合土工膜和坝基垂直防渗措施进行防渗漏处理。
The article aims to solve the problem of the dam foundation seepage of the Gongshang reservoir.
本文的研究工作是为解决弓上水库的坝基渗漏问题而展开的应用研究。
Several conditions of the dewatering hole on the fractured rock dam foundation are analyzed by means of the seepage principle of rock mass fracture network.
采用岩体裂隙网络渗流原理,对裂隙岩体坝基中设置排水孔的各种情况进行了分析。
One of the critical factors concerning dam construction on the water-saturation soft soil foundation is the seepage consolidation process.
饱水软基上筑坝,渗透固结过程是关键因素之一。
Seepage and seepage-pressure are important factors which influence the stability of dam foundation.
渗流、渗压是影响坝基稳定的重要因素。
The case study of dam foundation seepage exploration of Chongqing Reservoir shows the great effects.
在崇青水库坝基渗漏勘查中收到了良好的效果。
This paper deals with numerical techniques and analysis for three dimensional seepage flow through foundation of a large pumping station and its adjoining earth dam.
本文介绍某大型电排站地基与土坝组合体的三维渗流数值计算及有关方法,该项工作的目的在于应用有限单元法解决较复杂的工程问题。
The research about the section design, the treatment of spillway section and the anti-seepage system of overflow concrete face rockfill dam that is constructed on the rock foundation is performed.
本文主要探讨岩基上溢流面板堆石坝的断面设计、溢流段的处理和防渗系统。
Can meet the highway, railway, Bridges, industrial and civil building, harbor wharf, dam foundation seepage of construction needs.
可满足公路、铁路、桥梁、工业与民用建筑、海港码头、堤坝防渗等基础施工的需要。
Can meet the highway, railway, Bridges, industrial and civil building, harbor wharf, dam foundation seepage of construction needs.
可满足公路、铁路、桥梁、工业与民用建筑、海港码头、堤坝防渗等基础施工的需要。