In Jiangsu Shahe Pumped-storage Power Plant, both main dam and auxiliary dam of upper reservoir are rockfill dam with concrete slab.
江苏沙河抽水蓄能电站上水库主、副坝为混凝土面板堆石坝。
The upper guide bearing pads of unit 2 in Jiangsu Shahe Pumped-storage Power Plant had been burned to damage during commissioning period.
江苏沙河抽水蓄能电站2号机组在调试过程中曾出现上导瓦烧损事故。
The upper guide bearing pads of unit 2 in Jiangsu Shahe Pumped-storage Power Plant had been burned to damage during commissioning period.
江苏沙河抽水蓄能电站2号机组在调试过程中曾出现上导瓦烧损事故。
应用推荐