The World Bank loan will finance construction of Shihutang Complex comprised of sluice gates, a ship lock, a power station with an installed capacity of 120 MW, a dam and an access road.
世界银行贷款资金将用于建设石虎塘航电枢纽工程,包括闸门、船闸、电站、大坝和进场道路。
The Three Gorges Permanent Ship Lock is complex in its structure and intensity in its construction, with a varying climate in the site.
三峡永久船闸混凝土结构复杂,施工强度高,所处地区气候环境变化比较大。
A temporary ship lock was first applied for navigation during construction in China.
五强溪水电工程施工期采用临时船闸通航,在国内是第一次。
This paper mainly presents the soil anchor rod construction and experiment for Huai′an Third-line ship lock on Beijing-Hangzhou Canal.
主要介绍京杭运河淮安市淮安三线船闸土锚施工和试验情况。
The construction completion project of the Three Gorges two-way five-step ship lock is an important component of the Three Gorges Phase III project construction.
三峡双线五级船闸完建工程是三峡三期工程建设的重要组成部分。
The results show that there may be operation failure right after construction of Three Gorges ship lock.
研究表明,在三峡船闸建成初期,可能有一定碍航故障。
The results show that there may be operation failure right after construction of Three Gorges ship lock.
研究表明,在三峡船闸建成初期,可能有一定碍航故障。
应用推荐