Realistically, a budget accounting item for contingency allowance should be established whenever a contingency amount was included in the final cost estimate.
在实际操作当中,无论详细的成本估算中是否包括了意外事件,项目预算都应列支一笔应急储备金。
The first pass at the product-definition phase should allow you to establish a good rough estimate for an interface's cost, complexity, and design time.
产品定义阶段的第一个关口应该建立对接口价格、复杂性和设计时间的粗略估计。
During the period of preliminary design and construction drawing design, the budget statement should be prepared respectively so as to optimize the cost estimate.
在初步设计、施工图设计阶段分别编制初步设计概算书和施工图设计预算书,进一步优化成本预算。
During the period of preliminary design and construction drawing design, the budget statement should be prepared respectively so as to optimize the cost estimate.
在初步设计、施工图设计阶段分别编制初步设计概算书和施工图设计预算书,进一步优化成本预算。
应用推荐