• The factory acceptance test(FAT)and site acceptance test(SAT)of distribution automation system should be done before system putting into operation in order to ensure the product's quality.

    保证配电自动化产品用户验收阶段产品质量,需要进行出厂试验FAT现场试验(SAT),其中,馈线自动化测试是配电自动化系统试验的关键。

    youdao

  • Localized discharge test is currently the final and most effective acceptance test in the converter site.

    局部放电试验目前换流变现场最后也是最有效验收试验。

    youdao

  • Acceptance test site.

    验收试验现场

    youdao

  • Final Acceptance Test" means one or more tests of the System conducted in accordance with Seller's normal procedures at Buyer's Site to demonstrate that the System meets or exceeds the Specification;"

    最终验收测试根据卖方正常程序买方场所进行一次多次系统性能测试,证明系统满足超过规格;

    youdao

  • Final Acceptance Test" means one or more tests of the System conducted in accordance with Seller's normal procedures at Buyer's Site to demonstrate that the System meets or exceeds the Specification;"

    最终验收测试根据卖方正常程序买方场所进行一次多次系统性能测试,证明系统满足超过规格;