We analyse the sluice chamber by 3-D spline boundary element method.
用三维样条边界无法分析水闸闸室结构。
Such methods include that filling earth in the traffic bridge to change the position of gravitative centre of sluice chamber, and adding insertwalls to reduce the wall pressure of boxshaped wall.
在城西闸闸室稳定设计中,利用公路桥桥面适当填土来调整闸室的重心位置,并增做刺墙以减小空箱岸墙的墙后受荷宽度。
Such methods include that filling earth in the traffic bridge to change the position of gravitative centre of sluice chamber, and adding insertwalls to reduce the wall pressure of boxshaped wall.
在城西闸闸室稳定设计中,利用公路桥桥面适当填土来调整闸室的重心位置,并增做刺墙以减小空箱岸墙的墙后受荷宽度。
应用推荐