• The features and proportions of slurry and effect of borehole wall protection in different loose strata were mainly introduced.

    重点介绍了松散地层不同地层泥浆特性配比护壁效果、措施。

    youdao

  • The hole wall of anchor is sustained by slurry, common pressure grouting and the second high pressure grouting are used.

    抗浮锚杆成孔采用泥浆护壁工艺注浆采用常压注浆高压注浆。

    youdao

  • The cementing job quality was successfully controlled by means of carrying out the cementing design plan of wall shear stress and the leakproof method by raising slurry viscosity.

    通过实施壁面剪应力设计方法提高水泥浆粘度的防漏方法成功实现了固井质量控制

    youdao

  • In view of the property of slurry and the peculiarity of true soil, the mechanism of slurry dado with concrete curtain wall method in shaft excavation has been studied in this paper.

    本文泥浆性能土层特点出发,对混凝土帷幕凿井泥浆护壁机理进行了研究。

    youdao

  • The wall shear stress caused by cement slurry flowing in the annular space is a key element that affects the displacing efficiency.

    泥浆流动壁面剪应力影响顶替效率关键因素

    youdao

  • The polysaccharides of cell wall in waste beer yeast slurry were extracted by enzyme decomposition method.

    采用解法提取啤酒酵母酵母细胞壁多糖

    youdao

  • The technology of finishing float resisting anchor rod construction in deep sand layer with geological drilling rig slurry retaining wall technology is analyzed briefly.

    简要分析利用地质钻机泥浆护壁成孔工艺完成深厚抗浮锚杆的施工工艺。

    youdao

  • H. Rotary used in conjunction with slurry pump can be used for the drilling of rock, slurry wall for loosen stratum of the Quaternary period and deep hole drilling in.

    回转配用泥浆进行岩石钻进第四纪松散地质层泥浆护壁钻进。

    youdao

  • Slurry Wall pile punching; Quality control; Construction Supervision.

    泥浆护壁冲孔灌注桩质量控制;施工监理。

    youdao

  • A settlement computation method to the composite foundation composed of slurry wall-pile-box or thick raft is proposed, which is defined in the paper as two-stage settlement computation method.

    提出地下连续墙--所构成的复合基础沉降计算方法方法定义二阶段沉降计算方法。

    youdao

  • The results indicate that the design scheme of the project is feasible. It can ensure the stability of the slurry wall and backup wall, and does not affect the precision of jacking direction.

    计算结果表明设计方案可行能够保证连续以及后靠结构稳定不会影响顶管顶进方向的精度

    youdao

  • So-called composite (three functions) deep foundation structure is defined as: to use slurry wall, basement base plate and a part of plate beam as foundation pit bracing;

    基础结构工程设计中,将地下连续地下室底板部分楼板、作为基坑开挖时支护体与临时支撑

    youdao

  • The vibration and sinking-mould plank wall of seepage prevention is a new technique to mould continuous wall of seepage prevention underground by injecting slurry and sinking mould.

    根据龙潭水库地质条件,选用振动防渗板墙进行防渗加固。

    youdao

  • Analysis is made on the drilling techniques to the slurry retaining wall applied for the stake foundation in ports, and given the countermeasures.

    通过港口码头基础工程泥浆护壁成工艺分析提出解决钻孔过程中流沙及大颗粒卵石悬浮排清问题的方法。

    youdao

  • Analysis is made on the drilling techniques to the slurry retaining wall applied for the stake foundation in ports, and given the countermeasures.

    通过港口码头基础工程泥浆护壁成工艺分析提出解决钻孔过程中流沙及大颗粒卵石悬浮排清问题的方法。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定