A second set of switches (on the Model 7158) connects each capacitor to the pico ammeter after a suitable soak period.
第二组开关(7158型)在经过合适的平稳时间后将每个电容器连接到皮安计。
The leakage current will decay exponentially with time, so it's usually necessary to apply the voltage for a known period (the "soak" time) before measuring the current.
泄漏电流随时间呈指数衰减,所以通常需要在一个已知的时间期间内施加电压(浸润时间),然后再测量电流。
After a specified "soak" period, energize Ch. 21 to measure the resulting current.
在规定的“保压”周期后,激励通道21,测量产生的电流。
After a specified "soak" period, energize Ch. 21 to measure the resulting current.
在规定的“保压”周期后,激励通道21,测量产生的电流。
应用推荐