• A second set of switches (on the Model 7158) connects each capacitor to the pico ammeter after a suitable soak period.

    第二开关(7158)经过合适的平稳时间后将每个电容器连接皮安计。

    youdao

  • The leakage current will decay exponentially with time, so it's usually necessary to apply the voltage for a known period (the "soak" time) before measuring the current.

    泄漏电流时间呈指数衰减,所以通常需要一个已知时间期间内施加电压(浸润时间),然后再测量电流。

    youdao

  • After a specified "soak" period, energize Ch. 21 to measure the resulting current.

    规定的“保压”周期后激励通道21测量产生电流

    youdao

  • After a specified "soak" period, energize Ch. 21 to measure the resulting current.

    规定的“保压”周期后激励通道21测量产生电流

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定