The key element of achieving an integrated operation is to control the ramp feeding traffic through special signal timings at the diamond interchange.
建立综合运营控制系统的最关键的因素是通过在钻石立交信号机中特定信号配时来处理匝道反馈信息。
The key element of achieving an integrated operation is to control the ramp feeding traffic through special signal timings at the diamond interchange.
建立综合运营控制系统的最关键的因素是通过在钻石立交信号机中特定信号配时来处理匝道反馈信息。
应用推荐