• There goes the last of our spinning reserve .

    现在动用我们最后旋压储备了。

    youdao

  • The spinning reserve comprises generators running, but not at full capacity .

    储备包括运转中非满载的发电机

    youdao

  • In general, twenty percent extra power is the standard spinning reserve on the grid.

    一般来说,电网标准热备用20%。

    youdao

  • Wind can indeed supplement a grid with this needed twenty percent spinning reserve, but it cannot come close to replacing fossil fuel.

    风能确实可以弥补电网需要的20%的储备但是绝不可能替代化石燃料

    youdao

  • In the paper, the layout of spinning reserve scheme is essentially regarded as a risk and multi-objective decision-making problem.

    本文认为旋转备用方案制定实质上是个风险目标决策问题。

    youdao

  • In this paper the probabilistic technique of security function method is used to evaluate the spinning reserve requirements of power system.

    利用安全函数概率分析方法针对机组启停问题对系统旋转备用需求进行评估

    youdao

  • In this paper, the compensation cost of reactive power and spinning reserve supporting and automation generation control (AGC) is analyzed by economic measuring.

    为此本文对无功备用容量支持自动发电控制等运行费用进行量化分析和研究。

    youdao

  • Under the condition of competitive generation market, spinning reserve is an important ancillary service, its cost analysis is a problem needed to be urgently resolved.

    竞争发电市场环境备用作为重要辅助服务成本分析急待解决的问题。

    youdao

  • Therefore, the layout of spinning reserve scheme in the environment of electricity market should pay attention to both the reliability and the economy in power system operation.

    因此电力市场环境下旋转备用方案的制定需要兼顾电力系统运行可靠性经济性

    youdao

  • Based on electric energy cost analysis, the principle to determine the optimal number of operating units, the model of optimal distribution and dispatch of spinning reserve and concept of...

    基于电能成本分析,提出系统最佳开机台数确定原则旋转备用优化分配调度模型以及根据旋转备用边际机会成本确定旋转备用电价的思想

    youdao

  • In this paper, the probabilistic technique is used to evaluate the spinning reserve requirements of the system, that is, the reliability constraint is considered in the model of unit commitment.

    论文拟用概率方法评估系统旋转备用,即在机组最优启停模型引入可靠性约束

    youdao

  • In this paper, the probabilistic technique is used to evaluate the spinning reserve requirements of the system, that is, the reliability constraint is considered in the model of unit commitment.

    论文拟用概率方法评估系统旋转备用,即在机组最优启停模型引入可靠性约束

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定