The standard rating cycle for the lift generation system needs to generate at approximately 25% above maximum allowable loaded take off weights.
为升降机发电系统的标准评价周期需要产生约25%以上的最大允许装载起飞重量。
The standard rating cycle for the lift generation system needs to generate at approximately 25% above maximum allowable loaded take off weights.
为升降机发电系统的标准评价周期需要产生约25%以上的最大允许装载起飞重量。
应用推荐