In this paper, high temperature and high-pressure components fitting for life assessment such as main steam pipeline and boiler tube were selected for life management studying.
本课题选取适合寿命评估的高温高压部件,如主蒸汽管道及过热器管进行寿命管理研究。
The mathematical model of the fuel-steam pressure object is built through the power plant fuel-steam pressure's test data fitting.
本文对某电厂的燃料-汽压试验数据进行拟合,建立起燃料-汽压对象的数学模型。
Cogenerations economy analysis proved the benefits from the fitting of high parameters boilers and steam turbines.
经济分析证明,采用高参数的锅炉和汽轮机更具优势。
This paper presents an approach to machine steam turbine blades in 5-axis NC. By means of using a disc cutter with a concave end, curvature fitting is used to machine the convex and concave surface.
提出了一种汽轮机叶片五轴数控加工的实用方法,对于叶背和叶盆采用中凹盘形铣刀,基于密切曲率法给出优化刀位轨迹的计算方法;
This paper presents an approach to machine steam turbine blades in 5-axis NC. By means of using a disc cutter with a concave end, curvature fitting is used to machine the convex and concave surface.
提出了一种汽轮机叶片五轴数控加工的实用方法,对于叶背和叶盆采用中凹盘形铣刀,基于密切曲率法给出优化刀位轨迹的计算方法;
应用推荐