• The connecting hole on the upper arm of the hoist is penetrated by a connecting shackle connected with a main steel cable hanging rope.

    吊具上臂连接穿连接扣,连接卸扣连接钢丝绳系;

    youdao

  • The hole of the auxiliary hanging rope connecting plate of the upper arm of the hoist is connected with an auxiliary steel cable chain hanging rope and a small steering rope.

    吊具上臂连接孔内连接钢丝绳链条吊系转向

    youdao

  • The critical loads of linear elastic flexuosity were computed for 64,80 m hoist masts under the condition of inclined steel cable on the top using finite numerical simulation method.

    采用有限元数值模拟方法,分别计算这两种特大型起重桅杆顶端钢丝绳斜拉条件桅杆吊重线弹性屈曲临界载荷

    youdao

  • The critical loads of linear elastic flexuosity were computed for 64,80 m hoist masts under the condition of inclined steel cable on the top using finite numerical simulation method.

    采用有限元数值模拟方法,分别计算这两种特大型起重桅杆顶端钢丝绳斜拉条件桅杆吊重线弹性屈曲临界载荷

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定