• Each pump shall be fitted with a (stainless steel cable or stainless steel chain) of adequate strength and length to permit raising the pump for inspection and removal.

    为了进行观察拆卸,应该配置一条具有适当强度长度的(不锈钢不锈钢)将泵提升起来。

    youdao

  • To systematically study the whole construction process of pre-stress spatial steel structure, the inverse analysis method based on controlling the initial length of the cable is proposed.

    预应力空间结构施工成形进行系统研究,提出了基于控制求解索张拉力的分析法

    youdao

  • Finally, the calculation of the effective length of the tower and main girder for a certain steel cable-stayed bridge is illustrated.

    本文例举斜拉桥塔柱主梁自由长度及其稳定性的计算

    youdao

  • This method mainly control the unstress geometry size of each components of the whole cable-stayed bridge such as the unstress length of cable, unstress geometry of steel girder.

    这种方法是以组成斜拉桥部分构件应力几何尺寸斜拉的无应力索钢梁的无应力线形来主导施工控制

    youdao

  • This method mainly control the unstress geometry size of each components of the whole cable-stayed bridge such as the unstress length of cable, unstress geometry of steel girder.

    这种方法是以组成斜拉桥部分构件应力几何尺寸斜拉的无应力索钢梁的无应力线形来主导施工控制

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定