The steel plant process has been modeled as a multi-dimensional mass-flow control system in which the transformation of mass states, mass properties and flow control have been mixed.
本文将钢铁制造流程模化为物态转变、物性控制和物流控制相互融合的多维物流控制系统。
The productive efficiency was raised, energy was saved, and consumption was reduced by improving the process and equipment in Steel making Plant of Lingang.
新临钢炼钢厂通过工艺及设备技术改造,提高生产效率,节约能源,降低消耗。
The specific application of computer aid operation software for the crude benzol recovery process in the Coking Plant of Benxi Iron and Steel Group in the paper.
本文叙述计算机辅助操作软件在本钢焦化厂粗苯回收过程中的具体应用。
The blast furnace dust is a kind of solid waste that produced in the process of iron smelting. It is one of the main solid wastes of the steel plant.
高炉瓦斯灰是炼铁高炉在炼铁过程中随高炉煤气(亦称瓦斯)带出的原燃料的粉尘以及高温区激烈反应而产生的微粒,是钢铁企业主要固体排放物之一。
Congratulations on the fiftieth anniversary of the Xiangtan Iron and Steel plant, in the hope that the newly industrialized province in the process and make new contributions!
祝贺湘钢建厂五十周年,望在我省新兴工业化进程中再立新功!
This paper describes that the work has been done in smelting process and production of clean steel in No. 3 Steelmaking Plant of WISCO during recent years.
介绍了近年来武钢第三炼钢厂在纯净钢冶炼工艺和生产方面所做的工作。
Based on the rolling force model and field data of Baoshan steel plant, the rolling force during continuous hot strip rolling process is simulated by using the DEFORM-2D software.
应用DEFORM - 2d软件对带钢热连轧过程的轧制力进行了有限元模拟,并与宝钢轧制力模型进行了比较。
This article described the concept of green process engineering, introduced in detail that the application and practice situation of green process engineering in the Coking Plant of Anyang steel.
阐述了绿色过程工程学的概念,详细介绍了绿色过程工程学在安钢焦化厂的应用和实践情况。
The batch on-line scheduling problem is presented from the production of iron and steel plant, which is a main part of MES in process industry.
从钢铁生产热轧流程中提炼出了在同构并行机上的批在线调度问题,它是流程工业中MES的重要环节。
The research of new generation steel manufacturing process of steel plant should cover: platform technology for producing clean steel with high efficiency and low cost;
新一代钢铁制造流程的研究内涵应包括:高效率、低成本的洁净钢生产平台技术;
Effects of various process parameters on the surface cracking of steel grade HRB335 have been studied with the on-site data acquired from Yongxin Steel-making Plant as the basic material.
以永兴钢厂现场生产数据为基础,研究各种工艺参数对HRB335钢种表面横裂纹的影响。
In addition, ABB will provide state-of-the-art process automation for the steel plant including plate-mill drives to ensure energy efficiency and reliability across the production chain.
此外,ABB还将为钢厂提供顶级的过程自动化,包括保障整个生产链的能源效率和可靠性的轧板机驱动。
The corresponding causes of sticking breakout has been discussed from process, operation and equipment point of view in accordance with production practice in No. 3 steel making plant of Handan steel.
结合邯钢三炼钢厂生产实践,分析了工艺、操作和设备等因素对粘结漏钢的影响;提出了降低粘结漏钢次数的主要措施。
A series of measures to reduce energy consumption of LD process in steelmaking plant of Bao steel are briefed.
报导了宝钢炼钢厂降低转炉工序能耗的一系列措施。
The deoxidation process of low-carbon and low-silicon steel in steel plant of Chongqing Steel was introduced. The nuzzle clogging was analyzed and some measures were put forward.
介绍了重庆钢铁股份有限公司炼钢厂生产低碳低硅钢的脱氧工艺,对连铸过程中水口结瘤的原因进行分析,并提出了优化措施。
The deoxidation process of low-carbon and low-silicon steel in steel plant of Chongqing Steel was introduced. The nuzzle clogging was analyzed and some measures were put forward.
介绍了重庆钢铁股份有限公司炼钢厂生产低碳低硅钢的脱氧工艺,对连铸过程中水口结瘤的原因进行分析,并提出了优化措施。
应用推荐