• The main measure in piling process is to control the inclination of the steel sheet piles on both sides of the gap not to exceed 0.2%.

    过程采取主要措施控制合拢口两侧钢板倾斜度使其保持在0 .2 %以内。

    youdao

  • The piling technology of thin -wall steel sheet pile on water is discussed combining with an engineering case.

    结合工程实例,介绍水上施打薄壁钢板施工工艺

    youdao

  • The piling technology of thin -wall steel sheet pile on water is discussed combining with an engineering case.

    结合工程实例,介绍水上施打薄壁钢板施工工艺

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定