The paper studies the united energy dissipator with the grid and stepped spillway face by means of the spillway of Liudingshan reservoir.
本文以六顶山水库溢洪道为研究对象,采用阶梯式溢流面与格栅相结合的消能工。
The paper studies the united energy dissipator with the grid and stepped spillway face by means of the spillway of Liudingshan reservoir.
本文以六顶山水库溢洪道为研究对象,采用阶梯式溢流面与格栅相结合的消能工。
应用推荐