In the process of developing submarine cable laying installation for Shengli Oil Field, a certain problem has occurred with overcurrent tripping during switching on of step up transformer.
在为胜利油田研制海底电缆铺设装置过程中,曾发生升压变压器合闸时过电流跳闸问题。
Taking Chengdao Oil Field as an example, the methods for calculating the shutdown time, temperature dropping and restart pressure of submarine pipeline are introduced.
以埕岛油田为例 ,介绍海底管线停输时间及再启动压力的计算方法。
Taking Chengdao Oil Field as an example, the methods for calculating the shutdown time, temperature dropping and restart pressure of submarine pipeline are introduced.
以埕岛油田为例 ,介绍海底管线停输时间及再启动压力的计算方法。
应用推荐