• In floating offshore operations, the choke and kill lines exit the subsea BOP stack and run along the outside of the riser to the surface.

    海洋使用浮动船作业时节流压井管线是从海底喷器组直接排出的,之后通过外部导管到达海平面。

    youdao

  • In floating offshore operations, the choke and kill lines exit the subsea BOP stack and then run along the outside of the drilling riser to the surface.

    进行浮动海上作业时节流压井管线水下喷器组出来,之后沿钻井隔水导管侧面到达水面。

    youdao

  • In floating offshore operations, the choke and kill lines exit the subsea BOP stack and then run along the outside of the drilling riser to the surface.

    进行浮动海上作业时节流压井管线水下喷器组出来,之后沿钻井隔水导管侧面到达水面。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定