Generally this is in shallower water and more subsea equipment is recovered.
总的来说,水域越浅,需要回收的水下设备就会越多。
Design, develop and co-ordinate the installation, maintenance and operation of subsea well-head and production equipment.
设计,开发和统筹海底井口和生产设备的安装,维修和操作环节。
In the specific area of subsea production Wells, the focus is on equipment availability and reliability.
在特定区域的水下生产井,焦点集中在设备的有效性和可靠性上。
Christmas tree design for subsea applications, configured with the master valves and flow-control equipment on a horizontal axis to minimize the assembly height.
一种水下采油树,它在水平轴线上装有总闸门和流动控制设备,以便最大限度地降低装置的高度。
Christmas tree design for subsea applications, configured with the master valves and flow-control equipment on a horizontal axis to minimize the assembly height.
一种水下采油树,它在水平轴线上装有总闸门和流动控制设备,以便最大限度地降低装置的高度。
应用推荐