Though initiated from the system tests, in both cases the plan has the potential to include test levels other than system testing in order to align these test levels.
尽管是从系统测试开始的,但为了排列这些测试级别,在这两种情况中,计划都有可能包括系统测试之外的其它测试级别。
To develop a test strategy and plan, it is important to know which use cases are crucial to the functioning of the system and which are not.
要开发一个测试策略和计划,了解哪些用例对于系统功能是至关紧要的,哪些不是,这是很重要的。
Start by putting together a test team that's skilled enough to work on the target operating system and the middleware components you plan to use.
首先组建测试团队,此团队需要具有在计划使用的目标操作系统和中间件组件上工作的足够技能。
If this is a live system, plan time to repair any damage a test may cause, such as a failed router or hard disk.
如果测试是在活动的系统上进行的,应该计划相应的时间以修复测试可能导致的任何破坏,例如路由器或硬盘故障。
Review the system under test and plan the test steps.
检查被测系统并设计这个测试的步骤。
Boeing is responsible for leading the IBCS test activity, including developing the contractor test plan, testing software and hardware, and verifying and validating system requirements.
波音公司负责IBCS的测试,包括研发测试计划、测试软硬件以及核查和验证系统需求。
One needs to consider that the scope of a TMap master test plan, in principle, addresses multiple test levels, whereas in RUP it can also be a single system test.
一个需要考虑TMap主测试计划的范围大体上会有多个测试级别,而在RUP中可以只是单个系统测试。
Some teams also need to do system-level testing, so they organize their longer end-to-end tests into a single test plan folder.
有些团队还需要进行系统级的测试,所以他们将端对端测试组织到一个测试计划文件夹中。
Responsible for unit, module, integration and system testing including preparation of test cases, execution of test plan, verification and reporting of test results.
负责单元、模块、综合系统的测试,包括:开始程序的测试、执行计划的测试、运行结果的更正和报告。
Tasks for the collection of space data for the study of geosphere and biosphere and plan to support the Global Information System Test are enumerated.
文章还介绍了为支持全球信息系统试验研究计划中研究地圈和生物图而开展的各项收集空间数据的工作。
The platform mainly designed the hardware and software scheme for secondary battery performance test, and simulated actual resistance concrete plan through the load motor system.
平台充脚沉视了闭于两从电池机能检测的软软件计划设计和采取背载电机体解模拟实际阻力的略粗计划。
In the circumstance of computer informational system, many changes have happened in commercial bank's operation, such as audit procedure, audit plan, the test of interior control, etc.
在计算机信息系统环境下,商业银行审计程序、审计计划、内部控制测试等都发生了巨大的变化。
Firstly, the pulse rocket engine test system has been built and provides hardware constitute plan and test every aspect of the application of the test.
本文首先对脉冲火箭发动机的测试系统进行组建,提出了测试系统的硬件组成方案,并对测试系统的各个应用环节加以论证。
The guide rule and general plan to design a laboratorial test stand for drill pump valves are expounded, and the regulation and calculation of the system pressure of the stand are discussed.
系统地阐述了钻井泵泵阀试验台的设计指导思想和设计方案的确定依据,并介绍了试验台系统压力的调节方法和计算公式。
Third chapter in view of the concrete target of the KRG equipment and chooses test system plan.
第三章针对核电站KRG设备中的具体指标,选择测试系统的方案。
The system test of input and output standard definition, tested to be also carried on elaborating in detail for the test plan.
对于系统测试的输入和输出标准定义,在测试计划中进行了详细的描述。
This paper analyzes the characteristics of phone-data in TMN-system, designs a new plan to store data and realize quick-query, and also gives the result of performance test.
分析了TMN系统中话务数据的特点,设计了一种新的数据存储与快速查询实现方案,并给出了性能对比测试的结果。
Finally basis this plan realized the electronic technology Training college to move the educational administration system, the experimental test result indicated that this plan was feasible.
最后依据该方案实现了电子科技职业学院移动教务系统,试验测试结果表明该方案是可行的。
Finally introduces CRM system clues and business opportunities of the management subsystem of needs analysis and project plan and its design, development, operation and test, etc.
最后详细介绍了CRM系统线索与商机管理子系统的需求分析和项目方案以及其设计、开发、运行和测试等内容。
This paper proposes some viewpoints and approaches to teaching plan formulation, registration processing, class selection management, test management and so on in the flexible educational system.
本文对弹性学制中教学计划的制定、学籍处理、选课管理、管理等提出了自己的观点和具体的操作办法,并对弹性学制中存在的问题提出建议。
From these test data, the author analyzes the advantages and disadvantages of this system. Moreover, it makes a plan for the future research.
在这些测试数据的基础上,本文对该系统的优点和缺点进行了详细分析,并对工作进行了总结和展望。
Workers plan to test the system next year in a specially built community called Quay Valley.
工人们计划明年在专门建造的一个名为Quay Valley的社区进行测试。
Workers plan to test the system next year in a specially built community called Quay Valley.
工人们计划明年在专门建造的一个名为Quay Valley的社区进行测试。
应用推荐