• Real case calculations showed that this method enables to find out rapidly the optimum plan from single-group technical through train formation plans.

    经大量实例运算表明,用方法较快地单组技术直达列车编组计划的方案

    youdao

  • The article raises doubts and questions concerning some technical standards while analyzing conditions for train passing through.

    在对通车条件分析同时某些技术标准提出质疑

    youdao

  • By analyzing the relationship between the through goods train's linkage and the equilibrium of departure trains at technical stations, a network flow model for linking through goods train is set up.

    编制网络列车运行图重要的环就是处理直通列车技术的接续始发列车的合理协调问题。

    youdao

  • By analyzing the relationship between the through goods train's linkage and the equilibrium of departure trains at technical stations, a network flow model for linking through goods train is set up.

    编制网络列车运行图重要的环就是处理直通列车技术的接续始发列车的合理协调问题。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定