• Presently, the complete loading calculation mode is widely used as the design method of the metro station, but the vertical load from the temporary road surface system isn't taken into account.

    目前,我国地铁车站设计普遍采用一次加载计算模式,也没有考虑盖挖施工临时路面体系传递的竖向荷载

    youdao

  • Presently, the complete loading calculation mode is widely used as the design method of the metro station, but the vertical load from the temporary road surface system isn't taken into account.

    目前,我国地铁车站设计普遍采用一次加载计算模式,也没有考虑盖挖施工临时路面体系传递的竖向荷载

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定