• In terms of technology, blended cement, curing time, equipment, finished products and other aspects the construction method utilizing high liquid plastic limit clay in road bed filling is elaborated.

    通过广西岑梧高速公路二标段路基填筑施工实践,阐述采用含砂黏土填筑路基施工工艺方法

    youdao

  • In terms of technology, blended cement, curing time, equipment, finished products and other aspects the construction method utilizing high liquid plastic limit clay in road bed filling is elaborated.

    通过广西岑梧高速公路二标段路基填筑施工实践,阐述采用含砂黏土填筑路基施工工艺方法

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定