The Gantt chart in Part 1 outlined our Phase 1 work packages.
第1部分中的甘特图描述了我们第1阶段的工作任务包。
You can imagine them building up the Gantt chart as they go, filling in more and more detail.
您可以想象他们这么做实际上是在构建一幅越来越详细的甘特图(Gantt chart)。
The advantages of the Gantt chart are its simplicity, ease of preparation and use, and low cost.
甘特图形的优势是其简洁,便于准备和使用,且成本低。
As an advanced method, the CPM should be combined with the Gantt chart in construction management, and it can be especially well used in tendering.
作为一种先进的方法,网络计划技术在施工管理中应与横道图结合使用,在招投标工作中更应很好地运用。
To set a particular Gantt bar to be drawn over another bar, double-click an open area on the Gantt Chart and move the foreground bar below the background bar in the list.
如果要将指定条形图绘在其他条形图之上,请双击“甘特图”上打开的区域然后在列表中将前景条形图移动到背景条形图的下面。
When you measure success in features delivered, your guiding star is the carefully crafted Gantt chart.
当你以交付功能的方式度量成功时,绘制精美的甘特图就是你的指路明灯。
Plans are always documents, don't fall into the trap of thinking that, for example, a Gantt chart is a plan - its only a schedule diagram.
计划通常是文件。不要陷入陷阱,例如,认为一张甘特横道图是一个计划,它仅仅是一张进度表而已。
Click to rename the selected gantt chart.
单击此处可重命名所选甘特图。
In the schedule control, the main tools are Gantt chart and check list.
在进度控制方面,使用的主要工具是甘特图和核查清单。
The principle of network planning technique and network chart drawing method are illustrated and compared with Gantt chart analysis method in this paper.
介绍了网络计划技术的原理和网络图的绘制,并与传统的甘特图分析方法进行了比较。
The traditional project management tool, such as PERT and Gantt chart are used in activities sequencing. Those activities are independent with each other.
传统的项目管理工具,如PERT图、甘特图,都能清楚地显示各个作业之间的相互关系,也适用于合理安排作业执行的顺序。
Then the mathematical description of operation relativity is given systematically from algebraic specification, Gantt chart expression and type conversion.
进一步提出在经典的车间作业计划析取图模型中,通过加入相关弧以表示工序的相关性。
Plan the project using tools such as Gantt chart, PERT chart, planning trees, etc.
使用甘特图、PERT图、策划树等工具策划项目。
The program can be used to draw out the normal schedule time tables and their Gantt chart and applied to the real production system to make real time schedule.
该程序能产生正常情况下的调度时间表和甘特图,并能针对生产实际情况进行实时调度。
Authors design the maintenance processes, compile the operation schedule by Gantt chart and network diagram and analyze the schedule by deflection analysis method.
作者对检修过程进行流程设计,提出利用甘特图、网络图编制进度安排,利用偏差分析法对进度进行分析。
Authors design the maintenance processes, compile the operation schedule by Gantt chart and network diagram and analyze the schedule by deflection analysis method.
作者对检修过程进行流程设计,提出利用甘特图、网络图编制进度安排,利用偏差分析法对进度进行分析。