Conventional static loading method for long piles adopted in Zhengzhou Road-rail Bridge on the alluvial plain in the middle and lower reaches of the Huanghe River was introduced.
介绍了处于黄河中下游冲积平原的郑州黄河公铁两用桥深长桩基承载力测试的传统静载荷试桩法。
Conventional static loading method for long piles adopted in Zhengzhou Road-rail Bridge on the alluvial plain in the middle and lower reaches of the Huanghe River was introduced.
介绍了处于黄河中下游冲积平原的郑州黄河公铁两用桥深长桩基承载力测试的传统静载荷试桩法。
应用推荐