The only optimum design scheme was the combination form of full breadth weir and downside the shrinking weir.
通过分析比较,确定上部全幅堰与下部侧收缩堰相结合的方式是废水测流堰槽的最佳设计方案。
The only optimum design scheme was the combination form of full breadth weir and downside the shrinking weir.
通过分析比较,确定上部全幅堰与下部侧收缩堰相结合的方式是废水测流堰槽的最佳设计方案。
应用推荐