• The behavior of pile raft foundation in soft soil is a very important problem in geotechnical engineering.

    软弱地基基础研究一直岩土工程中的重要课题,也是土木工程设计的一项关键技术。

    youdao

  • Research for the deformation and internal forces of piled raft foundation on a thick soft substratum are concerned with not only the interaction between pile, raft and soils but the also the time.

    大量基础下存在厚的饱和软弱下卧层,变形内力研究不仅涉及到筏板、桩和三者之间相互作用,而且跟时间有很大的关系。

    youdao

  • A settlement computation method to the composite foundation composed of slurry wall-pile-box or thick raft is proposed, which is defined in the paper as two-stage settlement computation method.

    提出地下连续墙-桩-箱所构成的复合基础沉降计算方法方法定义二阶段沉降计算方法。

    youdao

  • The effect of the supporting pile on the interaction system of structure, raft foundation and soil is studied.

    研究支护结构上部框架结构—筏基地基共同作用体系作用,建立了共同作用体系有限元模型。

    youdao

  • Changed pile foundation scheme into raft foundation scheme saved the cost and minimized construction period significantly.

    基础改为天然地基基础,方便施工有效地缩短了工期、降低造价

    youdao

  • A method is proposed for the settlement and inner force analysis of rigid pile composite foundation raft system.

    提出一种分析刚性复合地基板基础相互作用体系内力变形的实用方法

    youdao

  • Detailed study was done in the determination of base bearing capacity, raft stake composite stress analysis, auger ground, bearing stratum stress stretching and pile foundation construction.

    对设计中的基础承载力确定复合受力分析、下卧软土、持力层应力扩展桩基施工等方面进行了较为详细的研讨。

    youdao

  • In addition, the analysis of the piled raft foundation with irregular shape of raft and the optimization of pile-layout could be easily carried out.

    方法方便地用于非均匀布桩、非规则平面形状基础计算优化分析

    youdao

  • Considering the thick backfill and soft foundation soil in the cut-and-cover section of Jiadi tunnel, a pile-raft foundation is accepted in order to avoid negative effect due to excessive settlement.

    隧道出口回填厚度较大基础土体软弱,因此采用了桩-筏基础的形式避免过大沉降带来的不利影响

    youdao

  • At last, design method as well as construction craft and quality control specification of the technology of reinforcing soft loess foundation under high embankment with pile-raft system is proposed.

    最后提出了桩-筏式复合地基处理黄土地基方法及其设计施工方法。

    youdao

  • Finally, a series of parametric analysis was made to study the settlement of piled raft foundation and the loads Shared by the individual pile and subsoil.

    最后对桩基础沉降桩以及土之间荷载分担情况进行一系列参数分析

    youdao

  • This method is prior to method of pile foundation code of China which is based on the assumption of the infinitely stiffness raft.

    此法现有桩基设计规范基于筏板绝对刚性假定的计算方法有一定的优越性。

    youdao

  • During the design of pile-raft foundation, there still exist many problems because the research on theory of piles' load-transfer mechanism is far behind the development of practice.

    目前由于桩基荷载传递机理没有完全研究清楚,桩基础设计无论理论上还是在实际上都存在某些不合理地方。

    youdao

  • During the design of pile-raft foundation, there still exist many problems because the research on theory of piles' load-transfer mechanism is far behind the development of practice.

    目前由于桩基荷载传递机理没有完全研究清楚,桩基础设计无论理论上还是在实际上都存在某些不合理地方。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定