For the subway station construction method discussed in this paper, new type of temporary system - military beam system was used.
文中介绍的地铁车站施工中,采用新型临时路面系统——军用梁结构。
The Sajin Bridge subway station under construction in Xi'an caved in Sunday morning, killing 2 workers.
2日上午,西安地铁一号线洒金桥站施工现场发生塌方事故,两名工人被埋身亡。
Over the past two months, a huge section of old homes just north of Gulou was bulldozed to make way for the construction of a nearby subway station.
过去的两个多月里,鼓楼南边的一大片老房屋已经被推土机清除,为修建地铁站让路。
Nowadays, one of the key problems beleaguering Beijing subway construction is the contradiction between station construction and space interval shield construction.
当前困扰北京地铁建设的关键问题之一就是车站施工与区间盾构施工的工期矛盾。
The application of displacement monitoring and forecasting method, taking the construction of Beijing Xidan subway station as example, have been discussed in detail and some new rules have recognized.
以北京地铁西单车站横通道施工为例,对位移监控及预报方法在地下工程中的实际应用作了详细介绍,得出了某些规律性的认识。
The cause of subway station top floor cracking during construction is analyzed, and the temperature stresses of the monitoring section are computed using the practical test data.
分析了施工阶段地铁车站顶板裂缝的成因,根据实测数据计算了监测段的温度应力。
The paper mainly describes the method of piling in pilot tunnel used in construction of the principal part of Dongdan Subway Station in Beijing.
主要介绍北京地铁东单车站采用洞桩支承法进行车站主体工程施工的方法。
The subway station displacement will be affected by the movement around the underground store induced by construction of top-down additional floors.
盖挖加层施工引起地下商场周围土体移动会对相邻地铁车站造成影响。
Owing to the narrow street in downtown area, inverted construction is usually adopted as the technical design and construction method of subway station.
在城市中心区狭窄路段采用逆向构筑地铁车站结构的工艺设计和施工方法。
To this end, this thesis proposes a construction program based on the developed shield tunnel with combination of cut and cover method of construction of subway station.
为此,本文提出了在已建成的盾构隧道基础上,结合明挖法修建地铁车站的施工方案。
With the large-scale construction of rail transit, the number of the subway station and the passenger-flow are increasing rapidly.
随着城市轨道交通大规模建设时代的来临,城市轨道交通车站数量的迅速增加,车站内的客流量也急剧增加。
The design and construction measures for Congwenmen station pass through the existing subway nearly was presented in this paper.
以北京地铁四号线宣武门车站下穿既有地铁车站工程为例,介绍了其具体工程概况,提出了相应的设计方案。
Distance from the Hongqiao integrated transport hub station 3 km, under construction on the extension of NO. 2 subway 800 meters.
距离虹桥综合交通枢纽站3公里,在建轨道2号线延伸段800米路程。
Distance from the Hongqiao integrated transport hub station 3 km, under construction on the extension of NO. 2 subway 800 meters.
距离虹桥综合交通枢纽站3公里,在建轨道2号线延伸段800米路程。
应用推荐