They wriggled their way through the tunnel.
他们在地道中蜿蜒行进。
Trains will speed through the tunnel at 186 mph.
火车将以每小时186英里的速度快速穿过隧道。
我们开车穿过了隧道。
The car goes through the tunnel.
汽车穿过隧道。
穿过隧道。我开车通过隧道。
The train ran through the tunnel.
火车穿过隧道。
请走地道过道。
A train is running through the tunnel.
一列火车正从隧道中穿过。
The train ran full speed through the tunnel.
火车飞速穿过隧道。
After about 10 minutes, passing through the tunnel, we arrived in kanten.
大概过了10分钟,穿过隧道,我们来到了克恩顿州。
When market comes back through the tunnel on the upside, we will get back in on the long side.
当市价回到并突破隧道上面,咱们会继续做多。
"You type:" Go north, "and you exit through the tunnel on your way into the unknown in the next room."
你输入:“往北走”,然后你就走出了这个房间,通过一个通道,走向另一个房间中的未知。
Through the tunnel of snapshots and synthetic seismograms are two ways of the tunnel with characteristic wave field analysis.
本文通过隧道波场快照和合成地震记录两种方式对隧道的波场特证进行分析。
Ok, introduce yourself over, then I want to through the tunnel of time and space, to go to the home of my ancestors Chang Jin.
好了,自我介绍结束了,接下来我要穿越时空隧道,到我的祖先常晋之家里去玩。
The results show that the air and wall temperature rises instantly with high amplitude of temperature variation, when the train moves through the tunnel.
测量结果显示:当隧道内有列车通过时,气温和壁面温度都瞬间升高,气温变化幅度较大。
Huge amounts now pass through the tunnel shafts each year, creating a new economy from which Hamas creams a handsome share of the profits to finance its rule.
如今,每年有大量的物资穿过隧道竖井,开创着一个新的经济体,哈马斯从中提取了丰厚的利润份额用以为其统治提供资金支持。
Lean back, and then throw your head and body forward when you spit, allowing both the air and the water to force your seed forward through the tunnel of your tongue.
吸气时先后倾,吐的时候头和身体再前倾,让气流和口水推动瓜籽经由舌头勇往直前。
The present damage situation of railway operation tunnels is very serious, sometimes they even threaten the traffic safety of the trains passing through the tunnel.
目前铁路运营隧道病害状况严重,有些已达到了威胁铁路行车安全的程度。
Despite this, 76 men crawled through the tunnel to initial freedom, even through an air raid during which the camp's (and the tunnel's) electric lights were shut off.
尽管如此,仍有76人爬出隧道重获自由,其间甚至还遭遇了因空袭引发的营地(和隧道)断电。
Around 50 passenger trains and up to 260 freight trains will travel through the tunnel every day, cutting the journey time between Zurich and Milan by around 40 minutes.
每天预计会有约50列客运火车、最多260列货运火车通过隧道,隧道的运行将从苏黎世到米兰的旅途缩短了约40分钟。
Around 50 passenger trains and up to 260 freight trains will travel through the tunnel every day, cutting the journey time between Zurich and Milan by around 40 minutes.
每天预计会有约50列客运火车、最多260列货运火车通过隧道,隧道的运行将从苏黎世到米兰的旅途缩短了约40分钟。
应用推荐