• By analysing the bearing condition of pier cap and foundation beam (tie beam), this article gives the design approach of pier cap and foundation beam (tie beam).

    通过分析基础(拉梁)受力状态提出了墩帽及基础梁(拉梁)的设计方法

    youdao

  • Tie beam is an important element in frame-shear wall structure.

    框架-剪力结构中,也是很重要的一个构件。

    youdao

  • The results indicate that the structure's seismic applicability will be worse if the tie beam is set.

    研究表明,设置梁后结构抗震适用性反而降低。

    youdao

  • Visual observations showed that a horizontal displacement in the longitudinal direction of the bridge developed between the tie girder and the top flange of the floor beam at the end connection.

    肉眼观察表明在端节点处横梁之间产生一种沿桥梁纵向水平位移

    youdao

  • The installment of tie beam of pier in high earthquake intensity regions was studied in the view of improving seismic performance of bridges.

    提高桥梁抗震性能角度出发,研究烈度桥墩的设置问题。

    youdao

  • For scattering of a bounded acoustic beam from a liquid-solid interface, the principal difficulty comes from the treatment of tie plane wave reflection coefficient.

    分析有限波束平面-界面散射困难主要发生平面波反射系数处理上。

    youdao

  • As not to impede his study, he used a rope to tie his hair to the house beam so that if he fell asleep it would pull on his hair and he would immediately come awake.

    为了影响学习他用绳子自己头发房梁上,一打盹儿绳子住头发,整个马上就清醒了。

    youdao

  • In this research, it had proved that the stirrup used in beam-column joints can be replaced with corner tie. It is obvious that the ability of resisting rebar buckled by corner tie was pretty good.

    研究探讨于梁柱接头使用代替箍筋之可行性,经由试验证明,角隅系对于抑制柱主筋挫屈有良好的功效。

    youdao

  • The foundation with a tie beam concrete casting, does not keep the construction joint continually.

    混凝土浇筑基础不留施工不断

    youdao

  • This paper assumes that the welded turnout in the continuously welded rail track is a structural system, and the railway tie in the welded turnout is a beam on the continuously elastic foundation.

    本文假定跨区间无缝线路中的无缝道岔结构体系,岔枕为连续弹性基础有限长梁

    youdao

  • Horizontal and vertical tie rods, fixed in the transverse waling to be erected between beams with spacing of 750mm to form an integrated beam to prevent displacement.

    之间纵横向水平将所有梁连成整体防止移位间距750mm,并固定横向上。

    youdao

  • Horizontal and vertical tie rods, fixed in the transverse waling to be erected between beams with spacing of 750mm to form an integrated beam to prevent displacement.

    之间纵横向水平将所有梁连成整体防止移位间距750mm,并固定横向上。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定