Stability control of the head faces top-coal is one of the key techniques of realizing high production and high efficiency to coal mining in fully mechanized top-coal caving face.
大倾角松软煤层综放面实现高产高效的关键之一是端面顶煤稳定性控制。
In the light of analogue test in laboratory, the stability of roof of fully mechanized working face with top coal caving is studied during withdrawing support at stop line.
通过实验室相似模拟试验,对综放面收尾撤架空间的顶板稳定性进行了研究。
In early application of fully mechanized top coal mining, Spontaneous fire took place when the backout of fully mechanized top coal caving face was stopped mining.
在应用综放开采的初期,每当综放工作面停采回撤时,就会发生自燃发火。
This paper introduces the base demand of back and forth conveyors in fully mechanized top coal caving work face, and introduces how to decide involved size;
介绍了在综采放顶煤工艺条件下,对工作面前、后部输送机的基本要求与有关配套尺寸的确定方法;
It was succeeded in practical application. It is an useful exploration for the roadway stability control of fully-mechanized top-coal caving long-wall face in soft and thick coal seam.
并成功进行了实践应用,为进一步完善松软厚煤层长壁综放工作面顺槽稳定性控制理论技术体系进行了有益探索。
Lengthening the width of isolated fully mechanized top coal caving face would reduce the abutment pressures for both wide and small coal pillars, and the coal pillar width could be reduced.
加长孤岛综放工作面长度,护巷大煤柱和小煤柱的支承压力均减小,可以减小护巷煤柱宽度。
The design of South Tsui million tons of coal mines with an annual output of 0.743 fully mechanized top coal caving mining face design.
现设计南家咀煤矿年产0.743百万吨煤综采放顶煤回采工作面设计。
The design of South Tsui million tons of coal mines with an annual output of 0.743 fully mechanized top coal caving mining face design.
现设计南家咀煤矿年产0.743百万吨煤综采放顶煤回采工作面设计。
应用推荐