• Since the aero maintenance cost takes a very great portion of the total operation cost of airlines, it is important to control the maintenance cost effectively for total cost control.

    航空维修成本航空企业成本占据非常比例有效控制维修成本对航空公司控制总成本具有重要作用。

    youdao

  • Chapter Five is an introduction to the calculation methodology of total cost control, with in-depth discussion of the theories, characteristics and calculation process of total cost accounting.

    第五:高校科研成本计算引入全面阐述了全成本计算法原理特点计算程序

    youdao

  • Tsonga came close to breaking Nadal at 4-4 in the second set. But one forehand and one backhand error, from 15/30, when in total control of the point, cost Tsonga the opportunity.

    第二战至4平时很有机会纳达尔的发球局,但是在30比15领先连续正手反手失误葬送绝好的破发机会。

    youdao

  • Thee methods of cost control practically are managed care and total budgeting.

    控制成本上升方法管理保健方法总额预算方法

    youdao

  • Precise state of charge (SOC) of traction battery is a key factor for power distribution of HEV power system, total control of vehicle and cost reduction.

    精确动力电池剩余电量(SOC)混合动力系统进行动力分配重要依据,也是整车控制降低使用成本的关键。

    youdao

  • The results indicated that water loss and the total cost of water leakage control decreased because of the optimal inspection interval.

    结果显示水量实施优化检测周期而减少,漏损控制费用降低。

    youdao

  • This paper has presented a set of new methods for environment cost control, using the ideas of Total quality Management (TQM) for reference from the Angle of environment quality cost.

    文章环境质量成本角度借鉴全面质量管理思想,提出环境成本控制方法

    youdao

  • It is the efficient way to appropriately use funds, reduce cost and to improve quality of products of implementing total quality management in centers for disease control and prevention.

    疾病预防控制机构实行全面质量管理合理使用资金降低成本损耗、提高产品质量有效手段

    youdao

  • Cartridges test system when meeting the requirements can control the total cost and maintenance costs, such the test system has high practical value.

    墨盒测试系统满足使用要求前提下,控制成本维护费用这样的测试系统具有很高实用价值

    youdao

  • In the remote automatic control irrigation system, the cost of data communication, generally accounts for 50% of the total input of the project.

    灌溉远程自动控制系统中,数据通讯部分工程投入一般工程投入的50%以上。

    youdao

  • Since the 80's, TQM and, quantification method fusion and quality cost, Total Quality Control, reliability project and zero flaw, have formed the more systematic TQM system.

    80年代以来全面质量管理量化质量成本、全面质量控制可靠性工程缺陷方法融合形成较为系统的全面质量管理体系。

    youdao

  • Construction cost constitutes only a fraction, though a substantial fraction, of the total project cost. However, it is the part of the cost under the control of the construction project manager.

    建造成本整个项目成本中的一部分虽然重要,只是施工项目经理控制成本一部分

    youdao

  • One the other hand, the raw material cost takes up high in the total product cost, the logistic involves a lot, and the process control is very complicated.

    一方面,类企业原材料消耗并且原材料成本产品成本中所占的比例很大物流涉及面广、流程控制复杂。

    youdao

  • Control of materials costs is the crux for control the total cost of a highway project.

    材料费用控制控制工程成本关键

    youdao

  • Software maintenance plays an important role in the total process of software development, but its cost is difficult to control.

    软件维护软件开发过程占有相当重要位置,但是成本往往很难控制的。

    youdao

  • The method presented in the paper could provide references for enterprises' environment cost control through cost analysis, total process control based on environment cost affirming and cost account.

    方法环境成本确认核算入手通过成本分析全过程控制企业进行环境成本控制提供了借鉴

    youdao

  • Because optimal signal control can lead to an increase of delayed cost of system, the goal of signal control is to minimize the total delayed cost of system.

    由于在交叉口进行信号控制使得系统延误增加,所以信号控制的优化目标使系统的总延误最小,同时要使得增加的延误在用户之间尽可能均衡分配。

    youdao

  • The total process control of engineering cost management is discussed by three stages of investment decision, design and construction.

    本文结合工程造价管理经验,投资决策阶段、设计阶段、施工阶段阐述了如何工程造价进行全过程控制

    youdao

  • The rates of chest pain, esophageal ulcer, length of hospitalization, and total medical cost in treatment group were significantly lower than those of control group (P<0.05).

    胸痛食管溃疡总住院天数、医疗费用治疗显著低于对照组P<0.05)。

    youdao

  • Implement actions to control inventory slow-moving materials so as to minimize total write-off cost.

    定期审核呆滞库存水平并采取相应措施实现报废成本最小化

    youdao

  • Results: gaps existed between Jilin province and national standard in single disease quality management and cost control. The ratio of drug income to total medical cost was too high.

    结果吉林省病种质量指标部颁标准一定差距医疗费用药品费用过高

    youdao

  • Results: gaps existed between Jilin province and national standard in single disease quality management and cost control. The ratio of drug income to total medical cost was too high.

    结果吉林省病种质量指标部颁标准一定差距医疗费用药品费用过高

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定