• The total float time is one of the important time parameters for a working task, and also is the basis for ascertaining critical work and critical paths in network planning.

    工作时差工作主要时间参数之一,是网络图关键工作关键线路判别依据

    youdao

  • The each time parameter of construction schedule network planning in the graph may be exposed immediately, the total float and the free float of each work especially.

    图上直接展示施工进度网络计划时间参数,特别是各工作时差自由时差。

    youdao

  • The each time parameter of construction schedule network planning in the graph may be exposed immediately, the total float and the free float of each work especially.

    图上直接展示施工进度网络计划时间参数,特别是各工作时差自由时差。

    youdao