The total time spent on the problem was approximately five days of our time, plus another 10 to 20 days for their developers to code and test the successful new approach.
解决这个问题共花费了我们大约5天时间,再加上他们的开发人员编码和测试成功的新方法又用了10到20天时间。
A sampling inspection plan for the failure rate of GBVE distribution with the test statistic of total experimental time based on Type I censoring is presented.
以总试验时间为检验统计量,在定时截尾寿命试验下研究GBVE分布产品失效率的抽样检验方案,随机模拟结果显示此方法有效。
A sampling inspection plan for the failure rate of GBVE distribution with the test statistic of total experimental time based on Type I censoring is presented.
本文给出了制定定时截尾寿命试验下指数分布产品失效率的抽样检验方案的一个新方法,检验统计量是总试验时间。
Print the total time on a single line for each test case.
有时候会考一些锻炼基本能力的题目,下面使用几个例子进行简单分析。
Print the total time on a single line for each test case.
有时候会考一些锻炼基本能力的题目,下面使用几个例子进行简单分析。
应用推荐