One of the most noticeable structrual differences between the cable-stayed bridge and the truss and girder types lies in the field of flexibility .
斜拉桥与桁架和梁式类型桥之间,在结构上的一个最显著不同之处,在于柔度方面。
Then an example of retrofit techniques of steel truss bridge is introduced, in which the concept of damage control design is adopted introducing an girder floor isolation system and hysteretic damper.
另外,还例举说明了钢桁架桥的改造,其设计引入了震害控制的观念,采用了桁架桥板梁隔震系统和滞后减振装置。
Based on analysis results, a formula for the calculation of restraining moment of single-plate connection between steel truss (steel girder) and RC wall is derived.
本文根据分析结果拟合得到了适用于钢桁架或实腹钢梁与混凝土墙体之间连接约束弯矩的计算公式。
The test result shows that deflection of CFST truss girder is mainly attributed to deformation of shear-bending parts and much smaller than that of solid web girder.
试验结果表明:钢管混凝土桁梁变形比实腹梁小很多且主要集中于边段;
The invention relates to a deck plate technique with a truss girder attached integrally to a bottom plate.
本发明涉及地板基板上以一体附着桁架梁的钢楼层板技术。
A kind of finite segment element model for analysis of shear lag effect in plate and truss composite girder is proposed. The model avoids certain deficiencies in conventional calculations.
提出一种板桁结合梁剪滞效应分析的有限段单元模型,避免了常规计算方法中的某些不足。
M series pneumatic is mainly used for hot rivet joint of metal structure such as joint work on steel structure of boiler, container, Bridges, large girder and truss of automobile, etc.
系列气动铆钉机主要用于对金属的热铆,如锅炉、容器、桥梁、汽车大梁和桁架等钢结构上的铆接工作。
Analysis is made on the structure of the space truss compound girder made from steel pipe concrete, and given directly the potential development.
介绍了钢管砼空间桁架组合梁式结构型式,通过分析它的受力特点,大胆预测了这种新型结构型式的广阔发展前景。
The segment assembling connection is a key procedure during the construction of truss stiffening girder of long span suspension bridge.
重点论述了南环大桥四柱式桥塔结构、缆索体系、全焊接钢加劲梁、环氯沥青桥面铺装等关键技术。
In this paper, a nonlinear finite element analysis of plate - truss composite steel girder is studied.
对板桁组合钢梁进行非线性有限元分析。
Because the girder construction is difficult and the technology request is high, so triangle truss style cradle is adopted.
施工难度大,技术要求高,采用三角桁架挂篮施工。
According to the computing result, in the project, the construction risk of continuous steel truss is the largest, followed by box-girder slide shuttering forms and deepwater foundation.
从计算结果来看,在该项目中,连续钢桁梁施工风险最大,箱梁移动模架施工风险次之,深水基础施工风险最小。
According to the computing result, in the project, the construction risk of continuous steel truss is the largest, followed by box-girder slide shuttering forms and deepwater foundation.
从计算结果来看,在该项目中,连续钢桁梁施工风险最大,箱梁移动模架施工风险次之,深水基础施工风险最小。
应用推荐