A full face rock tunnel boring machine was highly sensitive to geologic situation.
全断面岩石掘进机施工对地质地层状况非常敏感。
Full face rock tunnel boring machine (TBM) becomes more and more important in current tunnel construction.
全断面岩石掘进机施工对地质地层状况非常敏感。
Mountain tunnel construction with high water pressure will apply the tunnel boring machine method (TBM) more and more.
长大深埋高水压山岭隧道的施工将越来越多地采用隧道掘进机法。
The cutterhead and rock mass characteristics affect the excavation efficiency of full face rock tunnel boring machine (TBM) strongly.
全断面岩石掘进机(TBM)的破岩效率主要受刀盘设计和岩体特征的影响。
Abstract: : TBM(Tunnel Boring Machine) Cutting Tools Configuration is one of the most important factor during TBM cutting tool design.
摘罗要:盾构机刀具配置是盾构机刀具设计中是非常重要的内容。
Using artificial intelligence to make a type selection of full face rock tunnel boring machine an intelligent design system was established.
利用人工智能技术对全断面岩石掘进机进行优化选型,实现掘进机方案设计智能化。
Correctly determining quality parameters of rock is the theoretical basis of use of TBM (full face rock tunnel boring machine) and its design.
正确确定岩石的性能参数是全断面岩石掘进机使用及高性能全断面岩石掘进机研制的理论基础。
In this paper, three typical scheme design on mucking and transporting system of tunnel boring machine is studied, and the dispatch of the equipment in.
本文在研究隧洞掘进机开挖隧洞出碴及材料运输三种典型方案后,对其调度方案进行了设计计算。
Being a crucial factor in influencing the performance of Full Face Rock Tunnel Boring Machine (TBM), the cutterhead design is one of the key issues of TBM.
刀盘设计是全断面岩石隧道掘进机(TBM)的设计关键,是影响其掘进性能的决定性因素。
In order to rationalize type selection of the full face rock tunnel boring machine, a comprehensive solution substituting the empirical choosing method is presented.
为了使隧道掘进机选型决策理性化,避免单纯依靠设计者的经验进行选型,研究一种综合解决方案。
To improve the capacity and efficiency of the design system of backup transportation scheme for tunnel boring machine (TBM), a new hybrid-solving method was proposed.
为提高隧道掘进机后配套运输方案设计系统的能力和效率,提出了一种工程装备方案设计的混合求解方法。
Especially, to the tunnels constructed by TBM (tunnel Boring Machine), the work for advance geological prediction is crucial to the successful construction of a project.
尤其是对于TBM施工隧洞,超前地质预报工作开展的好坏是工程能否成功建设的关键。
Breaking rock rolling cutters are cutters of breaking rock with rolling in the way of the push of the cutterhead, they are used widespread in the full face rock tunnel boring machine.
滚动破岩刀具是在刀盘的推压力作用下滚动破碎岩石的刀具,广泛用于全断面岩石掘进机上。
He is also experienced in soft ground tunnelling using tunnel Boring Machine and NATM methods carried out in difficult ground conditions and at close proximity to important structures.
经历过使用盾构机进行软土掘进和在困难地层及靠近重要构筑物条件下使用新奥法。
A subway construction worker, known as a "sandhog" exits the tunnel boring machine in the northbound tunnel of the Second Avenue subway construction project, Thursday, April 7, 2011 in New York.
2011年4月7日,纽约,被称作“沙狗”的隧道挖掘工人从第二大街地铁建筑工程的北向的隧道的隧道掘进机中走出。
The kerf is the outside boundary of the tunnel wall that a boring machine gouges out as it bores through the ground or rock.
切口在隧道壁边界的外面,隧道壁是由钻机在钻透土地或岩石时挖出的。
The kerf is the outside boundary of the tunnel wall that a boring machine gouges out as it bores through the ground or rock.
切口在隧道壁边界的外面,隧道壁是由钻机在钻透土地或岩石时挖出的。
应用推荐