An explosion blew the roof and outer walls off of the number 3 unit Monday at the Fukushima nuclear power plant in earthquake-stricken northern Japan.
日本北部遭受地震的福岛核电站星期一发生爆炸,炸毁了3号机组的外墙和屋顶。
This paper introduces water pump house caisson construction of Huaneng Yuhuan Power Plant 1 000 MW unit, including geological conditions, structure and construction preparation, ordering and scheme.
对华能玉环电厂1 000MW机组工程的雨水泵房沉井施工作了介绍,包括:地质条件、结构型式和施工准备、顺序、方案。
Regarding the abnormal large vibration of reheat steam pipe of unit 3 for Shandong Huangdao Power Plant, the causes were analyzed.
针对山东黄岛发电厂3号机组再热管道出现的异常大幅度振动,进行了原因分析;
This paper introduces the application and energy saving result after unit 2 of Zhangjiakou Power Plant adopted less oil ignition and low load stable combustion technology.
介绍张家口发电厂2号机组采用少油冷炉点火和低负荷稳燃技术后的使用情况和节能效果。
The existing problems and influencing factors of the reheated steam control system of No. 4 Unit in Zhangjiakou Power Plant are presented.
介绍了河北省张家口发电厂4号机组再热汽温调节系统存在的问题及其影响因素。
The LP casing blade of unit 3 in Tuoketuo Power Plant is broken after only three months operation.
托电3号机组低压缸叶片运行仅3个月就发生了断裂。
In the end, based on electricity, the calculating methods for the cost and benefit of heating and electricity are studied, which are applied to air-cooled unit of BaoTou Second Thermal Power Plant.
最后,以电量法为基础,研究了热电联产热、电产品的成本效益计算方法,并将其应用于包头二热空冷机组的成本效益分析中。
Heat deviation analytical method is adopted, which is used to analyze the influences which the main operational monitored parameters have on the economic performance of the power plant unit.
采用热偏差分析方法,分析了锅炉主要运行可监控参数对机组经济性的影响。
The boiler MFT (master fuel trip) protection was actuated during start up of feed water pump A of Unit 1 and 2 in Huaneng Shantou Power Plant.
华能汕头发电厂1号、2号机组发生启动给水泵时锅炉主燃料跳闸(MFT)的事故。
Furthermore, Load optimizing distribution of main-pipeline unit is one of problems in the running of main-pipeline power plant.
此外,母管制机组间的负荷优化分配是母管制电厂运行中常遇到的问题之一。
This paper introduces collision tests used in Huaneng Yuhuan Power Plant 1 000 MW unit axial and radial alignments of turbine HP, IP and LP casings.
详细介绍了华能玉环电厂1 000MW机组采用碰撞试验的方法进行汽轮机高、中、低压缸轴向、径向定位。
The leakage in vacuum system of steam turbine for unit no. 4 in Zhangze Power Plant decreased thermal efficiency of said unit.
漳泽发电厂4号机组汽轮机真空系统泄漏,降低了机组热效率。
With comprehensive comparison and analysis on the advantages of the two operation proposals were provided for the selection of condensate polishing unit in the power plant.
通过对两种方式运行情况的优缺点进行了全面分析和探讨,对直接空冷机组凝结水精处理系统的选型提出了建议。
This paper based on a unit at a power plant overhaul cylinder thread repair damage after the success of the case details provide a deal with issues such effective solution.
通过实例对电厂大修时常见的汽缸螺孔损坏后进行修复问题的详述,提供了一种处理该类问题行之有效的解决方法。
The novel method of the fuzzy neuron model-free coordination control is proposed for a unit power plant with uncertainties in this paper.
本文提出了具有不确定性火电单元机组的一种前馈模糊神经非模型协调控制方法。
The condenser throat of power plant is the connective unit between turbine and condenser.
电厂凝汽器喉部是汽轮机与凝汽器的连接部件。
Dynamic characteristic of power plant thermal process is close related with operation conditions of power unit.
电厂热工过程的动态特性与整个机组的运行工况密切相关。
With the improvement of unit load and parameters of the thermal power plant, and also with the complicating of thermal equipments, automatic control systems are required more and more efficient.
随着火电机组容量和参数的提高及热力设备的复杂化,对自动控制系统的要求越来越高。
This paper briefly describes the siting of Qingshan Nuclear Power Plant, the first 300MW PWR unit of China.
本文简要介绍了我国第一座300MW压水堆型核电站——秦山核电厂的厂址选定情况。
The tests of vacuum system tightness against power unit 5 unit 7 in a power plant have been described and energy reduction of the vacuum system of the turbine has been analyzed in this paper.
通过对某电厂5号机组及7号机组真空系统的严密性试验,分析汽轮机真空系统节能降耗潜力。
The transformed air-cooling condenser of the heating unit of the NO. one Thermal Power Plant of Datong is the first direct air cooling in China, and is very important in water saving.
大同第一热电厂供热机组替代改造工程空冷凝汽器是国内首台大型直接空冷,对于节省水力资源具有十分重要的意义。
Air preheater a of Unit 5 boiler in Shajiao 'a' Power Plant experienced a secondary combustion during Standby. As a result, the air preheater was damaged seriously.
沙角发电总厂A厂5号炉a空气预热器(以下简称“空预器”)在停炉期间发生二次燃烧,造成该空预器严重损坏。
The power plant is the key unit of firefighting which is involved in inflammable and explosive materials, high accident rate and great losses.
发电厂到处都是易燃易爆物品,火灾事故发生率高,损失大,是防火重点单位。
For realizing the economic operation of generating unit, Huaneng Dezhou power plant put forward the scheme of putting 3 coal pulverizers into operation during low load.
华能德州电厂为了实现机组的经济运行,提出了低负荷时3台磨煤机运行的方案。
For realizing the economic operation of generating unit, Huaneng Dezhou power plant put forward the scheme of putting 3 coal pulverizers into operation during low load.
华能德州电厂为了实现机组的经济运行,提出了低负荷时3台磨煤机运行的方案。